Got a $30k bathroom quote - is that insane?

Short answer

Not automatically, but you cannot tell from one number. Ask for it broken out — demolition, plumbing, electrical, framing, waterproofing, tile, vanity and tops, glass, paint — with the allowances stated. Then get three quotes on the same written scope.

Ask for the breakdown

A single figure tells you nothing about what you are buying. The same total can be a careful job on a small hall bathroom or a thin job on a large one.

  • Demolition and haul-away.
  • Plumbing rough and fixtures.
  • Electrical, including any new circuits and the exhaust fan.
  • Framing changes.
  • Waterproofing.
  • Tile and setting materials.
  • Vanity, top and mirror.
  • Shower glass.
  • Paint and making good.

Which bathroom are you actually quoting

A hall bathroom with a tub-shower combination and a stock vanity is a different animal from a primary with a curbless shower, a freestanding tub and relocated plumbing. Moving plumbing on a slab means cutting concrete, and that single decision can move the price more than every finish choice combined.

The line I look at hardest

Waterproofing. A proper bonded membrane or a foam pan system, installed as one system rather than mixed brands, is what decides whether this bathroom is still sound in ten years. Cheap bathrooms fail at the pan, and the repair is a demolition.

The second is glass: it should be measured after the tile is set, not before, or it will not fit the opening you actually built.

How to compare quotes honestly

  1. Write the scope once, including allowances for tile, vanity and fixtures, and give the same document to everyone.
  2. Ask each bidder what is excluded.
  3. Ask who does the waterproofing and what system they use.
  4. Check the licence and insurance before you compare prices at all.

I do bathrooms across Lake Mary, Sanford and Longwood. If the shower is the reason you are remodelling, read why showers leak behind tile before you choose anyone.

Where a bathroom budget usually goes wrong

  • Moving the drain, which on a slab means cutting concrete.
  • Tile choice made after the quote, at twice the allowance.
  • A shower glass panel measured from drawings rather than from the finished opening.
  • Rot or old galvanised pipe found behind the tub, which nobody can quote until the wall is open.

The last one is the reason a small contingency belongs in every bathroom. Ask the contractor what they will do if they find it, and how it will be priced, before they start rather than on the day.

Krasimira Kakarova, Realtor and Certified Residential Building Contractor

Krisi Kakarova, World Properties Group

A licensed Florida Realtor (SL3327932) and a Certified Residential Building Contractor (CRC1335654), working in Seminole, Orange and Volusia County. Holding both is why these answers price the transaction and the construction together — more about how I work.

Last reviewed

Want this answered for your house?

Send the address or the plan. You will get the same answer as above, with the part that depends on your roof, your slab and your street filled in.

Ask about your house